Saturday, April 29, 2017

WK14 Bobwhite Manatee Transmission Line

       Week 14  lab finals we were given the task to run GIS Arcmap analysis for the Bobwhite Manatee Transmission Line. The projected consisted of filtering data for land sensitive areas, displaying land parcels and residential homes that would be affected by the transmission line. In the map below it displays all the residential homes within the preferred corridor and the 400ft preferred corridor buffer zone. This is just one of the maps that i generated for the project.
        The mapped displayed is a map showing the homes that are affected by the transmission line. The residential homes displayed are those that are within the preferred corridor and those that are within the 400ft buffer zone.





Students.uwf.edu/ve8/intro2GIS/Final_project/Final_project.pptx

Students.uwf.edu/ve8/intro2GIS/Final_project/Wk14_Finals_Transcript.pdf





Wednesday, April 5, 2017

WK13 Georeferencing

       In this week we learned how to georeference data by using the control points tool. We defined the spatial reference point to an unknown vector data. We learned what residual and Root Mean Square Errors are. This lab taught us how ot use many now tools in ARCmap. We used the editor, georeferencing, Multiple Image Buffer tool bars. Also we learned how to create a 3D map image using ARCscene.
      In the first map there are two data frames. The first data frame is of the UWF campus with an inset map of Escambia County, FLorida signifying the location of the Campus.
The second map shows a 3D rendition of the campus.